High Clearance Linked Tower

If you have pedestrian movement or personnel access through a structure, or even an obstruction like a machine or small building, we can use special frames to allow access at ground of mid tower levels.

Enquire about a similar project

 

High Clearance Linked Tower Examples

1. DESIGN CRITERIA
This tower structure and its components have been designed in accordance with EN1004:2004 and BS1139-6: 2014. This tower is suitable for both INDOOR and OUTDOOR use. The following tables show the permissible loads on the tower.
MAXIMUM SAFE WORKING VERTICAL LOAD
PLATFORM SAFE WORKING LOAD275 Kg over TWO platforms (evenly distributed)
TOTAL SAFE WORKING LOAD ON TOWER CONFIGURATION825 Kg Max. (evenly distributed)
SAFE WORKING HORIZONTAL LOAD
TOP PLATFORMS ON MAIN TOWER30 Kg exerted by one person only
NO. OF PERSONS ON TOWER
During USE, ASSEMBLY AND DISMANTLEMax. 3 persons
TOWER LOCATION
INDOOR USEYes
OUTDOOR USEYes
PDF Download

 

KEY ADVANTAGES

  • Our system complies with all leading International Design, Quality, Safety and Manufacturing Standards
  • A Safety factor of 4 applies to structure design, and unlike steel systems, a standard 5-year warranty period applies.
  • All springs, pins, bolts & miscellaneous hardware are tested & guaranteed as part of the high clearance linked tower system.
  • Full product & engineering support is provided