Linked Tower Structure

Using a “tower link tower” combination or a special “Spandeck” we can provide long walkway runs to a façade or roof gutter level, or even edge protection. Efficient and fast to erect, move and dismantle.

The ideal solution for Solar Panel installation work.

Enquire about a similar project

 

Linked Tower Structure Examples

1. DESIGN CRITERIA
This tower structure and its components have been designed in accordance with EN1004:2004 and BS1139-6: 2014. This tower is suitable for both INDOOR and OUTDOOR use. The following tables show the permissible loads on the tower.
MAXIMUM SAFE WORKING VERTICAL LOAD
PLATFORM SAFE WORKING LOAD275 Kg over TWO platforms (evenly distributed)
TOTAL SAFE WORKING LOAD ON TOWER CONFIGURATION825 Kg max. (evenly distributed)
SAFE WORKING HORIZONTAL LOAD
TOP PLATFORMS OF MAIN TOWER30 Kg exerted by ONE person only
NO. OF PERSONS ON TOWER
During USE, ASSEMBLY & DISMANTLEMax. 3 persons
TOWER LOCATION
INDOOR USEYes
OUTDOOR USEYes
PDF Download

 

KEY ADVANTAGES

  • Our system complies with all leading International Design, Quality, Safety and Manufacturing Standards
  • A Safety factor of 4 applies to structure design, and unlike steel systems, a standard 5-year warranty period applies.
  • All springs, pins, bolts & miscellaneous hardware are tested & guaranteed as part of the linked tower structure.
  • Full product & engineering support is provided

Associated Components

Linked Tower Structures

Related